Track is screwed to the supplied surfaces, which should be rigid and true. Plasterboard should be skimmed and have a background member within, to take 16 kg continuous tension of the finished product (32 kg point load during construction).
The jointing double track can be suspended using timber or MF metal studwork.
The sheet material is made (approx. 7% smaller than the survey measurements) at the production facility in France and is shipped to site normally within 21 days.
On site the material is warmed (to 40ºC using propane gas heaters.) and stretched using specialists’ spatula tools and clipped into the tracking system.
Apertures for lights, sprinklers, grilles etc. are then cut out with reinforcing rings welded to the sheet thus allowing final fittings to be installed.
Silicone sealed tracks to wall can achieve complete impermeable barrier as required for swimming pools and asbestos containment etc.Decorated walls must have first coat applied and tiled walls must be grouted before tracking.Other trades should take care once Barrisol is installed to prevent damage.